To: heanet-faults@listserv.heanet.ie
From: Brian McArdle <brian.mcardle@heanet.ie>
Subject: HEA-NOC/20100311-3 [CLOSE] BT PEW 100324-INFRA-CAT1 - Scheduled
outage to STACS
X-HEAnet-TicketID: 20100311-3
X-HEAnet-Ticket-Distribution: public
In-Reply-To: <20100311-3-4@mousetrap.hea.net>
References: <20100311-3-4@mousetrap.hea.net>
<20100311-3-3@mousetrap.hea.net> <20100311-3-2@mousetrap.hea.net>
<20100311-3-1@mousetrap.hea.net>
Message-ID: <20100311-3-5@mousetrap.hea.net>
Ticket Number: HEA-NOC/20100311-3 Ticket Status: CLOSE
Ticket Type: scheduled Resolver: BT Ireland
Ticket Opened: 20100311 10:32 UTC Problem Start: 20100324 00:01 UTC
Ticket Closed: 20100325 10:16 UTC Problem End: 20100324 06:00 UTC
Site/line: St. Angela's
Problem Description:
BT have scheduled internal fibre patch lead upgrades/replacement which
will
cause an outage on the STACS link for up to 30 minutes during the
scheduled
period.
Problem Effects:
Loss of connectivity to/from St. Angela'a College for up to 30 minutes.
Problem History:
20100311 10:29 LT Opening ticket to track.
20100324 09:31 BMA This work took place last night, with an outage to
STACS from 01:58-02:04. Will monitor.
20100325 09:54 BMA Link has been stable, and BT confirm work completed
successfully.
--
This ticket can be monitored at http://www.hea.net/tickets/20100311-3
HEAnet Limited. Registered in Ireland, No. 275301.
|