MouseTrap 3.2-e
HEAnet Logo Please contact noc@heanet.ie with any operational queries. Mousetrap Logo


Current status of ticket HEA-NOC/20100226-6: CLOSE

To: heanet-faults@listserv.heanet.ie
From: Cormac O'Cianain <cormac.ocianain@heanet.ie>
Subject: HEA-NOC/20100226-6 [CLOSE] ESBT EPW in Sligo/Cathleen Falls
fiber
X-HEAnet-TicketID: 20100226-6
X-HEAnet-Ticket-Distribution: public
In-Reply-To: <20100226-6-11@mousetrap.hea.net>
References: <20100226-6-11@mousetrap.hea.net>
<20100226-6-10@mousetrap.hea.net> <20100226-6-9@mousetrap.hea.net>
<20100226-6-8@mousetrap.hea.net> <20100226-6-7@mousetrap.hea.net>
<20100226-6-6@mousetrap.hea.net> <20100226-6-5@mousetrap.hea.net>
<20100226-6-4@mousetrap.hea.net> <20100226-6-3@mousetrap.hea.net>
<20100226-6-2@mousetrap.hea.net> <20100226-6-1@mousetrap.hea.net>
Message-ID: <20100226-6-12@mousetrap.hea.net>

Ticket Number: HEA-NOC/20100226-6      Ticket Status: CLOSE
Ticket Type:   scheduled               Resolver:      ESBT
Ticket Opened: 20100226 12:11 UTC      Problem Start: 20100320 07:00 UTC
Ticket Closed: 20100322 14:14 UTC      Problem End:   20100320 09:00 UTC

Site/line:     IT Sligo, LYIT, LYIT-Killybegs, St. Angela's

Problem Description:
ESB TOC have been informed that ESBT Construction/Maintenance require a 2
hour outage on the NTFON Fibre cable between Sligo POP and Cathleen
Falls/Letterkenny POP on Saturday the 20th of March at 07:00 hours.

Problem Effects:
Expected loss of resilience for Sligo and Letterkenny: Sligo IT, St.
Angela's College, and Letterkenny IT / Killybegs

Problem History:
20100226 11:43 RC open ticket

20100320 10:03 COC Contacted ESBT to inform them that we still see this
circuit as down.

20100320 10:20 COC ESBT informed us that they have finished splicing the
circuit and service should be resumed. Contacted NSN to check the Adva
equipment

20100320 11:16 COC NSN ticket is NA04680707. ESBT are disconnecting the
Fibre from 11:20 - 11:35 to run a spectrum test on it.

20100320 13:49 COC ESBT and NSN are sending engineers to Letterkenny. NSN
will be on site at 18:00

20100320 14:09 COC Service restores at 13:46. Contacted NSN and ESBT

20100322 12:16 COC This has achieved by leaving the lasers powered on in
Sligo.

Time to Fix:
6 hours 40 mins

-- 
This ticket can be monitored at http://www.hea.net/tickets/20100226-6

HEAnet Limited. Registered in Ireland, No. 275301.




Valid XHTML 1.1!